A good Monday

Today was bright and warm, a perfect day to be outside. It was also a day of three big installs at the work site. The control booth and sign for the Wave Swinger were installed today, changing the look of that area of the park in a significant fashion.

wave swinger control booth installed.png

The tricky install of the day was the prefabricated tree that was welded high on the mountain side under construction. It looks pretty cool and will look even better when the mountain and plantings are done around it.

tree on mountain.png

The final install of the day was all of the fence posts along the western edge of the park. (no picture).

With all of the art direction I had to do today - all over the work site, I climbed up and down that long staircase many times. By quitting time I was ready to have a little rest.

-grampa dan