First day onsite

Yesterday was our first day to work onsite at WhistlePunk Hollow. It started with loading the trailer with all the necessary tools and materials. Then there was the two hour drive to the worksite. Shortly after lunch time we had the tools unloaded. More supplies were purchased locally and stacked at the ready.  Then the real work began and we made quick progress. The small bridge was mudded and carved while the wiring of the big rock was completed.

bridge one.png

Next we tackled the concrete work on the big waterfall and then the big log bridge. We managed one side before darkness started setting in.

bridge two.png

Today the weatherman has an iffy forcast but we are pressing on as long as we can. The golf is looking fabulous and is almost ready to play. Everyone passing by awaits eagerly and encourages us onward.

-grampa dan