We spent the day finishing off the rigs and loading the trailers in preparation for the big move tomorrow morning. Everything was checked thoroughly and then checked once more. We’ll tighten up the straps one last time tomorrow and then check them again just before we hit the freeway. We know all too well (from experience) that we simply can’t be too careful with a load like this. The second, trailer holds the smaller sign tree, scaffolding bits and the heavy duty ramp we fabricated to facilitate moving the trees off the trailers. The entire crew is excitedly anticipating the adventure. Our hope is that every worry we might harbour is for nothing. Tomorrow is the day…

grant checking tie downs.png

Engineering puzzle

Our work demands a lot of engineering to make things work. Years of experience has allowed us to get good at this unique task. Our rule is that anything that people can go under, into or over requires an engineering professional to check and approve our plans. Even if our pieces don’t need a proper stamped and approved drawings they still require lots of structure, thought and planning. All need a sturdy welded steel frame, mounting base and lifting/tie down hard points. These have to be carefully thought out before the first piece of steel is cut and welded. Balance points and centers of gravity also need to be considered because all of our pieces have to be safely moved through the shop, transported to a distant worksite and then set into place and permanently fastened down. Doing all of this in a seamless and professional manner is imperative.

More often than not there are difficult challenges and hurdles along our journey. The Catoro Cafe is definitely one of those jobs. The trees were built flat on their backs to speed the construction process. Today, we tipped the heavy pieces (ranging from 1,500 - 2,500 lbs) on edge for transport. They will bolted back to back for stability. Once they are offloaded from the trailer we will move them singly, from a parking lot, around a city block and through a man door. Sloped sidewalks and walkways, potholes, bus shelters and other surprises will undoubtable make that process tricky. Slow and steady will rule the day. Then, once inside the building they will be rolled on their backs and finally tipped vertically into position against a wall and then securely bolted to a concrete floor. To accomplish all of this we fabricated sturdy steel frames with removable dolly wheels on two sides which were bolted to the tree halves. We’ll erect two scaffolds and beams and use twin manual winches to do the heavy lifting. A practice run today made us confident we’ve solved most of the challenges. Tomorrow we load the pieces and tools onto the trailers. The real thing happens Wednesday morning. Stay tuned…

building moving rig.png
2nd half on moving rig.png
sign on stand.png

Toning things down

To pull off the perfectly even blended glaze on the giant trees Becke enlisted the help of Alyssa who is already quite the expert at painting. Becke turned down my generous offer to help. She did tell me I am good at many other things - just not this job. The trees quickly came to life as they worked. Tomorrow, Becke will finish a few small details making the trees ready to load on Tuesday. Wednesday morning, first thing, we head into the city for the challenging installation. It’s going to be fun!

catoro trees painted.png
final glaze on trees.png