We are full-blast into the welding of the pencil rod armature over the structural frame of the pirate ship for Vala’s Pumpkin Patch in Nebraska. The front section of the ship is coming along nicely, with a little work left on the upper trim and railings, along with the iconic skull figurehead. It won’t be long until we begin framing out the even larger structure of the stern of the ship. It is going to be a busy week! Stay tuned…