The Lolo’s Fudgery sign now has all the base coats and blends completed. This week the painting crew will begin work on the multiple glazes followed by the lettering. By the end of the week, this sign should be finished and moved out of the shop. Stay tuned for final pics…
Dragons - a pair
It is not often we repeat ourselves. Building more than one of anything isn’t a whole lot of fun. But the North Star fire pit needs two fire-breathing dragons so in the last couple of days I formed and welded up the second piece. It went much faster than the first. With the two dragons on hand, it is time to weld them into the base. Once that is finished along with the water feature we’ll call up the crane to lift these final pieces into the garden. Stay tuned…
Super productive week!
Thanks to a well-organized and hardworking crew it was a super productive week both in the shop and over at the Hazelnut Inn. The waterwheel is now fully welded save for the paddles. Keith spent the day cutting and forming those thirty-two pieces today. Next week we’ll weld them on which will ready the two halves of the waterwheel to be unbolted and taken out into the driveway. We’ll then use a crane to do a test assembly which should be exciting. Stay tuned…
