Each day a little more of the Hazelnut Inn's Avellana ship cabin gets sculpted. The giant hazelnut under the stern windows got the treatment today. Tomorrow the big ribbon will hopefully get done leaving only the area around the windows remaining. The windows are due to arrive September 6 which means we should be able to complete these before the ship gets lifted into position.
Brave Juniper!
It is a wonderful thing to be able to play an important role in designing and building fun places for families to enjoy. Enjoying these special places with our own family is even better. Juniper has been itching to show grandma and grampa how brave she is by riding the Runaway Train Roller Coaster and other attractions up at Cultus Lake Adventure Park. This past weekend we went up to experience it for ourselves. We had a great time and Juniper is indeed very, very brave!
Special delivery
My Sign Invitational piece has been gathering dust for much of our busy summer but with a spell of cool weather here for the weekend I found time to do a little work. I did a little work on the back of the Timekeeper's factory. I fastened the 1/8" plywood panels on the building, cut and mounted the windows and applied a little sculpt to roughly shape the back of the building. While I worked on that the CNC router was working in the backroom cutting out the delivery vehicle. After supper I added the sculpt to the front and one side of the cute little truck. It's looking pretty cool already! With the truck well underway I can now finalize the height of the loading dock and begin the detail work on the back of the building.
