On this, the last working trip to Trinidad we placed the very last features in place inside the train tunnel. They still have some painting, special lighting and final set dressing to do but the treasure we built is in it hiding place for guests who ride the train to discover. Today we finished the last of the touchups on the hundreds of features and signs we built in our studio. The next trip will be for the grand opening sometime very soon.
Finished three times over.
Things are going well in Trinidad at Skallywag Bay Adventure Park. We are getting in lots of practice between the all too frequent downpours of this week. We finished this wall lettering three times, only to be followed by a sudden downpour. It would take off some of what we did and run it down the wall each time. We'd paint it again and have time to stand back and admire it before another storm raced over the mountain and drench us once more. The third time we got lucky and the rain held off long enough for the paint to dry thoroughly. The brightly coloured lettering is about six feet tall.
Skallywag Bay drone footage
The work at Skallywag Bay Adventure Park in Trinidad continues daily. A couple of weeks ago some drone footage was captured that shows the park well. Much work has been done since these shots were taken but I thought I would show them today to give viewers a good idea of the layout of the park. We've had many requests. It is going to be very beautiful once all the landscaping is in place!
