Jay polished off the painting of the second tower for the rear gate of the Hazelnut Inn over the last couple of days. To keep things as efficient as possible, we fabricated the feature in the shop, and we will use our forklift to transport it next door to the Inn. As soon as the piece is bolted to the footing, the crew will measure everything and then fabricate the metal gates to replace the temporary farm gate that has been hanging there since we began construction almost a decade ago.
