We have scheduled a structural welder to help us with the heavy-duty structure for the giant scarecrow on Monday of next week. Our task is to have all the structural steel cut, fit and tack-welded into place before he arrives. It was a tall order without a doubt. Laura did most of the cutting, while Matt did the bevelling on each piece so the welder could achieve maximum penetration. My task was to interpret the structural drawings, measure, fit and tack the steel pieces into place. The three of us worked hard all day and completed the job with minutes to spare. We are ready for the welding to begin on Monday. Stay tuned…
