Top plaster work complete!

Peter, Matt and Grant have been very busy on the Hazelnut Inn of late, doing their best to get all of the high plaster work done before the cooler and wetter fall weather sets in. The bulk of the front facade of the North Star suite is now complete and looking very fine. It has sure changed the look of the building in a big way! With the upper portions now complete they will begin welding up the armature for the rock work and waterfall on the east side of the building.