Over the last three months the construction crews have dug huge holes, built forms and poured huge blocks of cement for the footings. Big concrete columns followed after that and then the gravel was carefully wheeled in and packed around them. The final grades were determined and then the missing pieces of the golf were rebuilt. That was our job. Now, as we finish our work the big steel crews have been unloading massive pieces of roller coaster structure and placing it around the site in preparation for some dramatic changes which will begin in earnest tomorrow.
A giant crane will arrive onsite to tip up and place the tall steel columns and long, burgundy track pieces. Giggle Ridge is about to become a much more exciting place!