Yesterday was the day for the lift of the last piece of the mountain. With the installation of this piece the only thing left is to install the elevated train track and the runaway locomotive. It will precariously hang on twisted and broken track over the Blastin' Barrels spinning roller coaster track which curves tightly at the bottom.
We have a little concrete rock work to do at the bottom edge to bring it to the ground and also to contain the waterfall. If you look close you can see the welded cage and the beginning of the lath work.