Building a rock from the inside out

Today we spent the day working on the waterfall rock. Big Matt wired for the bulk of the day. Then I fired up the welder and started in on the remaining structure. The job at hand was to weld up to the upper portion (which would lift off. By defining this line they will fit togehter perfectly when we reassemble then onsite. There's still a bunch of work to do tomorrow but the toughest side is now done.

waterfall structure .png
waterfall structure 2.png

Monday morning it will be heading down the highway to Squamish with the top following a little while later. It won'ty be long until the water tumbles down the rocks. Stay tuned...

-grampa dan