There was lots of things going on in the shop today. I was designing things for the router. Little Matt was welding up a storm on the structures for the log features.
Out in the parking lot big Matt and Peter did the detail concrete work on the steam donkey.
By the end of the day the face of the log on the truck was routed and laminated to it's frame. Little Matt climbed into the log one last time to weld the sign structure into the log frame.
It won't be long until both pieces are sculpted and ready for paint! Stay tuned...
-grampa dan