The bottom section of Castle Fun Park’s giant mushroom castle now sports two coats of the base colour. Next up is the blend coat which will be followed by the coloured glazes. It won’t be long until this piece is ready to be installed. Stay tuned…
Top section sculpted
The top section of the Castle Fun Park mushroom castle is now fully sculpted and ready for paint. Each of the three sections is large and they will tower over the golf when installed! Stay tuned for the colourful paint job…
Parking lot wall
The last bit of the Hazelnut exterior to be finished was the parking lot wall. Like the rest of the Hazelnut Inn, it is designed to look like it has been there for a very long time. The wall ends at a tower, built from rock and brick. The broken top will overflow with plants when it is finished. The board at the top will hold a lantern to light the parking lot. It is going to look great when it is painted.
