We finished the installation of the TOT's Castle at Cultus Lake Waterpark some time ago but construction of the pool was still underway when we left. Now with the summer holidays right around the corner the pool is complete and open. I took the opportunity to head up to the lake this morning to grab some pictures of the finished project before the crowds arrived. The giant sand bucket and castle sure changes the entrance to the park!
Building a better bracket
Since we put the MultiCam CNC plasma cutter in our shop we have built hundreds of brackets for all manner of projects. The days of plain and ordinary brackets is now long gone for with a little imagination and design the plasma machine can cut whatever we need in great style. The NEBS pub will have hundreds of feet of overhead pipes connecting the giant barrels and stills. They need brackets to hold them up against the ceiling beams. I whipped up a prototype as proof of concept and we liked what we saw when it was welded up. There was only one last thing to do... and that was cut enough pieces for thirty-three more. :)
Ready to pour...
The construction crew has the Hazelnut Inn footings forms all buttoned up and all of the rebar carefully tied into place. We are ready to place the concrete. It is pretty exciting to say the least. Now all we need is the final blessing of the city officials. Then the fun officially begins. Stay tuned...
