Barrels painted

The NEBs Pub project is one we relegated for rainy days, between more pressing outside jobs. Today it rained and the two large barrels got Jenessa's undivided attention. The painting on these beauties is now complete. As soon as we move the large center pieces out of the shop the edge pieces will get bolted back on in readiness or shipping. I can hardly wait to see them all together!

nebs barrels painted.png
nebs barrels painted 2.png

Taking our dragon for a ride

Pulling the giant steel dragon down our town street in the local parade was great fun without a doubt but seeing a dragon in that context wasn't overly surprising for most viewers. Today, we dismantled the parade float and lifted the dragon onto our flat deck trailer. We were delivering him to his permanent home about five miles distant. While I could have easily laid the dragon flat on the trailer I knew it would be a whole lot more fun to transport it in the upright position. As expected, we turned lots of heads on the stately cruise to our client's farm. Dragons are best transported in grand style! :)

dragon delivery.png

First four

Our MultiCam CNC router was humming for much of the day as it carved out the first seven of the workshop attendee's name plaques. It's pure magic as the machine automatically carves the Precision Board, knowing exactly where to go and what to take away. Even after operating the machine for more than a decade I still find it fascinating! First it does a rough pass, then automatically does a tool change to a smaller bit before completing the final pass. The machine even puts the tool away when it is done. Now the skilled hand work begins as the plaques get their final details and colour. It will be MAGIC!

first four.png
first set on router.png