The painting is progressing rapidly on the two outhouses for Cultus Lake Adventure Park. By tomorrow afternoon they will be ready to ship. Monday morning, bright and early the crane arrives to load them for transport.
Boardwalk signs assembled
The three Boardwalk signs were assembled today. Each features a plasma cut profile of five of the Cultus Lake Adventure Park rides. Tomorrow I'll be hand carving the woodgrain on the side of the panels. Painting will start soon after.
Ribbit
Today was a busy one as I welded up the bracket, assembled the sign and did the rough sculpt on the jumping frog for the ribbit ride. It's double sided and will look fun from any angle.