Ghost ship

After months of cutting, welding and grinding steel it feels like we are now getting down the the end process at long last on the Viking ship project which is bound for Dubai. Today we assembled and lathed the first half of the second ship in preparation for the beginning of the sculpting tomorrow morning. The ship looks like a giant silver ghost ship tonight. Tomorrow that will change in a hurry! The first ship gets it's final paint tomorrow and then will be ready to load into six containers next Tuesday.

The great wall

Signs are important. So are first impressions as a customer approaches a facility we design. That's why we pull out the stops to make the facility as impressive and appealing as possible before our guests even get inside. The fences and walls we design are part of the attraction. The adventure golf at NEB's will be a multi level challenge with the upper portion running along the fence line. The railway runs below. This offered a wonderful opportunity to be creative with the fence. Guests on the outside can easily see exciting stuff inside through large portholes placed strategically along the perimeter. The landscaping and theme work is wall to wall and from ground level to the very top. Signs are skillfully incorporated into the design. There is of course a whole lot more going on than this simple rendering shows...  This is going to be FUN!