The giant tree top was finished and pulled from the shop today. It is but one third of the tree that will become the 18th hole feature of the Skallywag Adventure Golf in Trinidad.
Small in size - big on detail - times two
The two ship sculptures are now complete and ready to be mounted on the sign bases. Just about everyone on the crew worked on these two beauties. Tomorrow they will be welded into place and the last of the concrete work will be done on the base. Once the concrete has cured it will be time for a little paint and then these two signs can be stroked off the to-do list.
Four days and counting
It was back to work once more. In our absence the crew did awesome. The last couple of small pieces were delivered up to Giggle Ridge today. The Round-Up sign had been installed.
With only four more days until the season opening the pressure is on to get everything done. Giggle Ridge now sports new carpets throughout.
