Trim a little off the top please

Today the Element Spray Foam crew was finished the spraying of the insulating foam. It was time for a little trimming of the extra foam in places they had oversprayed and it was time for a big clean from one end of the house to the other. Ryan and Colin made good time on the first room and then finished the upstairs area before the tend of the day. Right behind then Matt began fastening the strapping in place.

trimming foam.png

With the finishing of the spray foam the house is noticably quieter than before. As we begin addding insulation and drywall it will get even quieter as we proceed - something we were counting on as we built so close to the road in order to give us the maximum back yard we desired. 

Just before noon the engineer came by for an inspection and was delighted with the job they had done. Thanks to the ELEMENT Spray Foam crew for a WONDERFUL JOB! It is starting to REALLY look like a house inside at last!

-grampa dan