Curving the hallway ceilings.

One of the themes that will run through every aspect of the house is the arch. The windows, beams and many of the ceilings feature arches. I've long believed that curves are much more pleasing than straight lines.

Although we've had our MultiCam CNC router for better than six years, our new house is the first time we've used it for all aspects of a very large project. Generally, we do the theme work with others in charge of the framing. In the case of our new house we are using the computerized router in every possible aspect of the build. The router cuts the pieces we need extremely fast and extremely accurately. I take careful measurements and then use a program called EnRoute Pro to design and create the cutting files. These are sent to the router from my desk. The hard part of the process is loading and unloading the plywood onto the router.

I designed and cut forty plywood pieces for the arched hallway ceiling in less than an hour today. They hd a smooth arch on the bottom, but the top side was notched for the built-in vacuum and runs of wiring. Each piece was cut perfectly without effort. It took me far longer to fasten the pieces into place.

hall archway.png

This week we'll put in the potlights and run a bunch more wiring. Then we'll put in the insulation and board up the bottom. Lastly we'll staple on the lath just before we trowel on the concrete plaster. The curved celing will have a heavy crown molding under it and hidden in the top of the molding will be plenty of LED lights to give the curved ceiling a beautiful glow. I can hardly wait!

-grampa dan

Two more pieces...

We designed and routed the first few vertical trim pieces for the outside of the house. After the crew went home yesterday and things finally quieted down I installed a couple to make sure we liked the result. Now we can go into full production to create the rest of the pieces we need for all around the house.

vertical trim.png

With the front gable soffits in place it was time to begin the welding of the tops of the giant trees. Peter welded up the first today. This week the crew will add the expanded lath to the trees and then we can start sculpting them at last!

center tree welded to top.png

The many pieces of the house are quickly coming together!

-grampa dan

Rapid rock work!

Today we continued the sculpting of the rockwork around the house as well as more facia board. The left side of the house is largely complete as far as concrete sculpting. Paint work will begin next week.

concrete work on east side of front.png

The east side of the house is also ready for paint. The routed trim will be painted separatey and put on afterwards.

east side of house.png

The roofers are making good progress on the roof and have started the first eyebrow. The PenFold's Eco recycled rubber shakes bend easily over the gently curved roof. I am really liking the look of the premium product! As good as they look, the fact that we will never have to roof again in my lifetime makes me feel even better!

front entry progress.png

The carport roof is now shingled save for the ridgecap.

carport progress.png

Tomorrow, we begin the decorative work on the upper reaches of the center portion of the house. I can hardly wait to see it come together!

-grampa dan