One more place to dig

Today the fellow who is putting in the up to date septic system for our new house arrived to put in the field. This meant tearing out some fence was necessary along with 30 feet of lawn.  He used his exavator to dig two long holes for the dual fields which will be installed tomorrow. We put a bunch more sand into the foundation as well.

septic field.png

Once the field is in we'll shape the land a final time at a higher level than was there previously. The berm than tapers down fron the shop will gradually grow wider and higher until it reaches the house. When we bought the place nine years ago it was flat and boring. But we are changing that in  big way. I love it when a plan comes together!

-grampa dan

Sand, sand and more sand.

Getting the sand into the foundation is no simple task. Low telephone wires along the road restrict any dumping in the front yard. The soil in the front yard is also soft restricting access from that angle. The side yard to the east is less of an option because of many neighbor's trees. The back of the new house is only four feet away from the old one. No access there - especially from big machines. The only real access to the new house foundation is via the carport which is four feet higher than the current driveway which is to be raised as part the building process.

Gravel trucks are backing up our 14' wide driveway and dumping load after load after load of sand and gravel in many piles - up to 14 loads per day.

bobcat in driveway.png

We then ferry these loads up the ramp into the new carport area and dump the sand over the wall into the foundation. Peter is running the bobcat for the most part although I've logged more than a few hours in the bucking machine.

ramp up to foundation.png

Once the sand is over the wall it is my job to use our small front end loader to ferry the sand around the foundation to be levelled out and then packed into place - all 550 cubic yards or 55 truckloads. This is on top of the hundreds of yards of engineered gravel fill we put in the hole before the footings. 

Small tractor inside foundation.png
sand in foundation.png

I'm getting more than a little tired of moving plain old gravel and sand day after day but it is a job that needs doing. Every project we tackle has plenty of behind the scenes and plain work underneath. The house is just a little larger than most meaning the non-theme work will take a little longer than usual. Pretty soon we will get to the fun stuff!

-grampa dan

Quiet day.

After a frantic week I was ready for a day of relative relaxation. I slept in a teeny bit then headed out to eyeball our progress on the house. I measured up for some plumbing supplies we needed and then headed into town. Todays job was to put in a few of the underground conduits we would need.

The electrical/mechanical room is in one corner of the house. Gas, sewer, water, telephone and cable all come to this same place. This means that conduits from the outside come up inside the walls. I also needed to locate a sewer line across the foundation space from the old house. This pipe will be cut off and abandoned when the new house is complete. All of the pipes had been cast through the walls when we poured the concrete. It was a simple task of cutting and gluing the pipes together, making sure everything sloped the right amount.

wiing and plumbing conduits.png

Tomorrow we'll begin packing in a whole bunch more sand. Stay tuned...

-grampa dan